Dawlish | Devon

BACKGROUND

  • When we signed the agreement the land was allocated for development within the local plan.

  

WHAT WE DID

  • Completed investigations into the ground conditions, ecology, the roads and drainage, noise and arboriculture, and completed full architectural plans.
  • 201 unit scheme was designed.
  • Scheme to be applied for with an outline application determining the point of access giving a developer certainty to maximise value of the site for the landowner.
  • Even with an allocation, this site would cost the landowner in excess of £275,000 to achieve a planning consent.
  • A full viability process is being completed to reduce affordable housing and section 106 contributions to maximise  landowner funds.

 

THE OUTCOME

  • Application due for determination within 18 months of the agreement being signed.